INTEGRATED CAPA WORKFLOW
Problem → Root Cause → Action → Effectiveness → Closure
Every analysis and action below is linked to this CAPA record.4/11workflow steps
CONTROLLED APPROVAL WORKFLOW
Electronic Approval & Rework
Segregation of duties is enforced: a CAPA owner or creator cannot approve the same CAPA.
Draft Not Submitted
No approval request has been submitted.Submit the CAPA when the problem definition and ownership are ready for independent quality review.
CAPA Details
Problem definition and evidence baseProblem Statement
Quality event requiring investigation, corrective action and preventive controls for: Unexpected downtime of critical inspection equipment.
Containment
Provided backup inspection equipment and rescheduled affected checks.
Root Cause
Preventive maintenance interval was based on calendar time rather than usage hours.
Corrective Action
Revised maintenance interval using equipment usage data.
Preventive Action
Added condition-based maintenance monitoring.
Effectiveness Check
Not documented
Root Cause
Corrective & Preventive Action Plan
Actions feed the operational side of the CAPA workflow.| Type | Description | Owner | Due | Status | Update |
|---|---|---|---|---|---|
| Corrective | Implement corrective action for CAPA-2026-0030: Revised maintenance interval using equipment usage data. | Process Engineer | 2026-08-29 | In Progress | |
| Preventive | Implement preventive control for CAPA-2026-0030: Added condition-based maintenance monitoring. | Quality Manager | 2026-09-05 | Planned |
Linked Analyses
One-click access to every analytical layerFishbone / Root CauseNot startedStart analysis →
Pareto AnalysisNot startedStart analysis →
Markov Lifecycle ForecastNot startedGenerate lifecycle →
CAPA Summary
SourceEquipment Audit
OwnerProcess Engineer
Detected2026-08-11
Target2026-08-29
Verification-
Submitted-
Final Approval-
Closed-
Workflow Timeline
Traceability of the CAPA improvement cycleNo workflow events yetEvents will appear as you create analyses and complete actions.